An updated water system is being installed underneath the current high school parking lot this fall. School officials report that things are in the final stages of infrastructure preparation. The district has finalized the pool design (renderings coming soon!) and will be going out to bid on the pool construction this fall, with a plan to begin construction in spring of 2025.
Posted inUncategorized